Meie Reflex BIM-platvorm annab MEP-planeerijatele ja paigaldajatele kiire juurdepääsu kohandatud BIM-objektidele Autodesk Revitis, IFC-s ja muudes vormingutes.
Klienditeeninduse tellimine
Reflex Solutions Pro
PROSINUS® X
Dokumendid ja videod
BIM@Reflex
Reflex
Reflex
Kust me tuleme, mis ajendab meid, mida me toetame?
Messid ja üritused
Me oleme rõõmsad, kui saame teid sellel aastal jälle isiklikult mõnel meie üritusel osalemisel tervitada.
Winkelmann Building+Industry
Winkelmann Building+Industry on Winkelmanni grupi äriüksus.
Reflex Winkelmann GmbH
Me aktuaalsete kavade ja ürituste ülevaade
Winkelmann Building+Industry
Regioon/keel
Project
The energy self-sufficient Grabenmeier agricultural farm, Ahlen
Operated by Winkelmann Land & Forst GmbH & Co. KG
Date of commissioning: Disconnection from the grid: 11 February 2020
farm
heating, solar thermal, potable and service water
separation, pressure maintenance, make-up, manifold technology, water storage technology
Performance parameter
3 photovoltaic systems with 30, 30 and 25 kWp
CHP unit with 14 kW electrical and 19 kW thermal output
Battery storage with 135 kWh
2 grid-forming inverters, each 42 kW
Task
The entire farm is energy self-sufficient—no water or electricity from outside. The main energy source is three photovoltaic systems. Excess energy is either stored temporarily in two specially manufactured Reflex storage tanks and/or used for rapeseed oil production in a rapeseed mill. The electricity is also used by heating elements for hot water preparation and backup heating. In case of a shortage of solar energy (e.g. in winter), backup is provided by a CHP unit, which is operated with self-harvested and pressed rapeseed oil. Since the farm, and with it all its animals and inhabitants, is dependent on a reliable energy supply, the entire system must run faultlessly and redundantly
Product solution
Dynamic pressure maintenance
Ventilation: Reflexomat RS 90/1 with Reflexomat primary tank RG 800
Underfloor heating: Variomat
Servitec 35-T vacuum spray-tube degassing system
2× Fillset Impuls make-up fittings
2× Fillsoft softening systems
2× Reflex Storatherm Heat Combi 20000-S
4× EFHR 19KW electro flange heaters
1 of 1
Achieved goals
Everything from a single source – pressure maintenance, degassing, water make-up, water treatment, and distribution and storage technology, come as a complete system from Reflex and Sinus. This means the products are coordinated with each other, ensuring maximum operational safety and efficiency. State-of-the-art control technology also guarantees monitored and automated operation.