Project

  • Datum der Inbetriebnahme: 2021

  • Kunde: Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V.

  • Auftraggeber: Alexander Ochs Gruppe

factory
heating, cooling
separation, pressure maintenance

Performance parameter

  • Static height: 10m

  • Safety valve actuating pressure: 3.0 bar

  • Heat and cooling output: approx. 300 KW

  • Temperature: 70/50°C and10/16°

  • Volume: approx. 5,000 litres and approx. 9,500 litres

Task

  • The joint project between Frauenhofer and the KIT Karlsruhe Institute of Technology centred on converting the building for new usage. A research factory for AI-integrated products was to be created. The main requirement was a long-term solution that provided maximum security and durability

Product solution

  • 2 × Reflexomat RSC 200

  • 2 × Servitec 35

  • 2 × Fillset

Achieved goals

  • Inefficient old equipment was replaced by modern Reflex systems and a reliable degassing system was installed. To provide optimal technical support to research operations, pressure maintenance as well as degassing systems have been installed from the extensive range available. Operations are now running smoothly and efficiently.